Skip to main content

The workspace

Opening a composition shows its data: the toolbar, the chart and the table. Everything else is edited in the side panel, which slides out from the right when you select Columns, Properties or Indicators, or a column heading or chart series. On a wide screen the data moves left so you can see it while you edit.

The workspace, with a column open in the side panel

The side panel has these tabs:

TabWhat it edits
ColumnsThe list of columns, then one column at a time
PropertiesThe name, where it is stored, the worksheet settings, report settings, meta data, conversion defaults, scripts, automation and builds
IndicatorsTrend lines, levels and averages drawn on the chart (see Chart indicators)
InputsTemplates only: the inputs the template asks for (see Templates)
JSONThe configuration that is saved, and the response of the last run

Edits mark the data as out of date. Select Run, or close the panel, to see them. Nothing is saved until you select Save, and you can undo any change until then (see Undo and redo).


Undo and redo​

Undo and Redo, beside Save in the toolbar, step back through your changes and forward again. Every change to a composition or template can be undone: adding, removing, moving or editing a column, the properties, the layout, the inputs of a template, and a change made by Fusion AI.

Keys
Ctrl+ZUndo
Ctrl+Y or Ctrl+Shift+ZRedo
  • Typing in a field is one step, not one step per letter. While the cursor is in a text field, Ctrl+Z undoes your typing in that field as usual; click outside the field to undo whole changes.
  • Undoing back to the version you last saved clears Unsaved changes, and saving keeps the history, so you can still undo past a save.
  • Making a new change after undoing drops the changes you could have redone.
  • With the side panel closed, the data is shown again after each undo or redo; with it open, select Run.
  • The history is kept while the composition is open, up to the last 100 changes, and starts again when you open it.

Running a composition​

Choose an Ondate and select Run to calculate the composition for that date. A curve composition starts at the previous weekday, the latest settled curves; a timeseries composition starts at today.

When you open a saved composition, or pick another ondate, and it has already been built for that ondate, Composer shows the stored build straight away instead of calculating it. The line under the toolbar says so, and when the build was made. Run always calculates it again now.

More, Export CSV downloads what is shown.


The columns list​

The Columns tab lists the columns in order, each with its colour, caption, id and what it is calculated from. You can:

  • Move a column up or down, or remove it
  • Select a column to edit it
  • Add data column, Add expression column or Add linked column
  • On the Master Data screen, add one of the record's curves or timeseries in one click

Removing a column that an expression uses asks first.


Data columns​

A data column shows a curve or a timeseries from the platform. Start typing part of its id for suggestions, or select Find to look it up by its dimensions.

Finding data​

Find opens the data finder, which works the same way as finding data in the portal:

  1. Choose Public or Private data, and, on a timeseries worksheet, whether to look for curves, timeseries or both.
  2. Select Filter by... and choose a dimension, such as source. Its values are listed, for example ICE and EEX. Pick one or more.
  3. Add another dimension, such as location, and pick Germany. Each dimension only lists the values that are left after the filters before it, and the list shows the data that matches all of them.
  4. Narrow it further by typing part of the id in Id contains.
  5. To check the data before you use it, select the eye at the end of a row. For a curve it shows the latest curve, on today or the most recent date before it, with each tenor and its value. For a timeseries it shows the last 10 values. Select it again to close it.
  6. Click a row, or Use this in the preview, to use it.

The list shows the currency and units of each curve and timeseries next to its name and kind.

When there are too many matches to count, the finder says More than the number shown so far; select the next page to see more, or add a filter to narrow it down.

The dimensions are the ones defined on the types of the master data, such as source, commodity, product and location. Remove a value with the cross on its chip, or select Clear filters to start again. Composer remembers your filters for the next time you open the finder.

Curve and timeseries inputs, when you use a template, have a Find button too.

Data column settings​

Setting
CaptionThe column heading in the table and the series name in the chart
IdThe name used for this column in expressions, such as BRENT. Letters, digits and underscores, starting with a letter. Renaming it updates the expressions that use it.
Curve, or Timeseries or curveThe data id

On a curve worksheet, every data column is a curve, read for the composition's ondate.

On a timeseries worksheet, the search lists both timeseries and curves:

  • Choose a timeseries to show it as it is.
  • Choose a curve and Composer switches Source to Curve tenor and asks for the Tenor, such as M01 or GM01. The column shows that tenor of the curve as a timeseries, for example the front month each day. The tenor list is filled with the tenors of the curve's latest contracts.

You can also type a curve tenor in full, for example ICIS.ESGM.NL.TTF.ASS.FUT:MID:GM01; Composer splits it into the curve and its tenor.

note

On a curve worksheet the rows are lined up by tenor. Gas curves often use tenors that start with G, such as GM01 for gas month 01, and these line up with the same tenor of other curves: GM01 with M01, GD01 with D01, GQ01 with Q01, and so on for weeks, seasons, years and balance of month. A power curve and a gas curve therefore share the rows M01, M02, and so on.

On a timeseries worksheet, Observed says how the values are combined or spread out to the worksheet's calendar: beginning, end, averaged, summed, high, low or delta. Leave it empty to use the worksheet's setting, or the timeseries' own.


Expression columns​

An expression column is calculated with an ODSL expression from the columns before it, for example:

POWER - GAS / 0.49 - CARBON * 0.202 / 0.49

You can use the ids of the other columns, numbers, + - * / and brackets, and ODSL functions.

As you type, suggestions appear (press Ctrl+Space to see them all):

  • the ids of the other columns,
  • the functions in the scripts chosen under Properties, Scripts,
  • the built-in functions that work on the worksheet: those for curves on a curve worksheet, those for timeseries on a timeseries worksheet.

Use the up and down keys to choose, and Enter or Tab to insert. A function is inserted with its opening bracket. Inside a function call, its signature is shown with the current argument highlighted and described. The chips under the field insert column ids too.

tip

To use a function of your own, add the script that defines it under Properties, Scripts. Its functions then appear in the suggestions.


Linked columns​

A linked column shows a column of another saved composition of the same type. Choose the Composition, then the Column. It is stored as COMPOSITION/COLUMN, for example OIL_ANALYTICS:COLIN_HARTLEY_BRENT_WTI/SPREAD.

A linked column reads the other composition's stored build for the same ondate, so build that composition for the ondates you run this one for. If it has not been built for the ondate, the column shows an error saying so. On a timeseries worksheet, only the dates within this composition's range are used, aligned to this calendar.

Linked columns can be used in expressions like any other column. See Builds, composed curves and automation.


Display​

Each column has display settings:

Setting
Table and Excel grid, Chart, ExcelWhere the column appears: the table, the chart, and the Excel Add-in (see Compositions in Excel). Hide a working column that only feeds an expression.
Chart typeline, spline, area, areaspline, column, scatter or step
Line styleSolid, Dash, Dot and others
Axis1 (left) or 2 (right), for example a spread on axis 2 under two prices on axis 1. Each axis is labelled with the currency and units of the columns on it, such as EUR/MWh
Draw orderNormal draws the columns in their order, so later columns are on top. Choose Behind the other columns to put a column at the back, for example an area or columns behind price lines, or In front of the other columns to bring it forward
ColourThe series colour

Chart indicators​

Indicators are lines drawn on the chart: a trend line or a level you draw yourself, or an indicator calculated from a column, such as a moving average, Bollinger bands, a VaR envelope or an oscillator like RSI or MACD. They are saved with the composition and shown in the portal too. They only add to the chart: the data, the table and Excel are unchanged.

Select Indicators in the toolbar to open them in the side panel.

A 20-day moving average, a trend line and a resistance level on a timeseries composition

IndicatorHow to add it
Trend lineSelect Draw trend line, then drag on the chart from its start to its end, or click its start and then its end. Each click snaps to the nearest tenor or date. The line carries on to the end of the chart unless you clear Extend to the end of the chart.
LevelSelect Draw level, then click the chart at the price, for example a support or resistance level.
Calculated indicatorsChoose one from Add an indicator..., then choose the column and its settings, such as the period, the number of points.

The calculated indicators are drawn on the chart, on the axis of their column, or in a pane of their own below it:

IndicatorWhereWhat it shows
Moving averageOn the chartThe average of the last points of a column.
Exponential moving averageOn the chartAs a moving average, weighted towards the latest values.
Bollinger bandsOn the chartA moving average with bands a number of standard deviations above and below it.
Donchian channelOn the chartThe highest and lowest value over the period, and the middle of the two.
Parabolic SAROn the chartDots that trail the trend and change side when it reverses.
VaR envelopeOn the chartThe range each value was expected to stay within at a confidence level, such as 95%, from the value a horizon earlier and the volatility of the changes over the window before it. Red dots mark the values outside it.
Linear regressionOn the chartThe straight line that best fits a column.
Relative strength index (RSI)Below the chartMomentum from 0 to 100. Above 70 is often read as overbought, below 30 as oversold.
MACDBelow the chartThe fast exponential moving average less the slow one, its signal line, and a histogram of the difference.
Stochastic oscillatorBelow the chartWhere the value sits in its range over the period, from 0 to 100, and its average.
MomentumBelow the chartThe change in the column over the period.

Parabolic SAR and a 95% VaR envelope on the chart, with RSI and MACD in panes below it

Each indicator below the chart gets a pane of its own, and the chart grows to make room. A composition holds one value per tenor or date, with no high, low or open, so the Parabolic SAR, the Donchian channel and the stochastic oscillator use the highest and lowest values of the column itself. The VaR envelope works in the units of the column, so it also suits spreads that go negative.

The chart does not zoom while you draw. Press Esc to stop drawing. Click an indicator in the list, or its line on the chart, to change its label, column, settings, values, axis, line style or colour. Draw again on the chart redraws a trend line, and Pick the level on the chart moves a level.

Indicators on later ondates​

An indicator is added on the ondate you are looking at. With Keep on later ondates ticked, which is the default, it is shown on every later ondate too. So a trend line you draw on yesterday's composition is also on today's, and on every build made from now on. Clear it for an indicator that belongs to one ondate only.

Ondate shownIndicator added on 13 October, kept on later ondatesIndicator added on 13 October, this ondate only
12 OctoberNot shownNot shown
13 OctoberShownShown
14 October and laterShownNot shown

To remove an indicator inherited from an earlier ondate, choose whether to remove it from this ondate onwards, so the earlier builds keep it, or from every ondate. The Ondates section of an indicator shows when it was Added on and, if it was, Removed from; you can change both. Indicators not shown on the ondate you are looking at are listed under Not on this ondate.

On a curve composition the trend line is anchored to tenors, such as M02 to M06, so on a later ondate it is drawn between the same tenors of that day's curve.

note

Save the composition to keep its indicators. Saving indicators does not make its stored builds out of date, and changing them does not need a Run. A template keeps the indicators shown when it is saved, and compositions made from it show them on every ondate.


Conversion​

Values can be converted to another currency or unit. Settings cascade: a column's setting is used first, then the worksheet's (Properties, Conversion defaults), then the curve or timeseries' own.

Setting
FX providerThe exchange rates to use for currency conversion; empty for your organisation's default
CurrencyConvert to this currency, for example EUR
UnitsConvert to these units, for example MWH or BBL
TimezoneConvert to this timezone
PrecisionThe number of decimal places
Rounding modeHow values are rounded, HALF_UP unless set
Density, Time factor, Heat rateConversion factors, for example a density to convert tonnes of a product to barrels
Custom unit factorsA factor for a unit of your own, for example therm

Properties​

SectionSettings
Name and descriptionShown in the list, the portal and Excel
Stored inThe master data record it is stored on, with Move to..., and the template it was created from
WorksheetType (curve or timeseries) and how it is shown in the portal. For a curve worksheet: a fixed Ondate (blank for the report's ondate), and the tenor types to show and how many of each, for example 12 months, 4 quarters and 2 years. For a timeseries worksheet: the Calendar the timeseries are aligned to (BUSINESS, business days, when empty; or for example DAILY, HOURLY or MONTHLY, but not an expiry calendar such as #REOD) and the Range.
ReportEnabled, hide in the report list, hide in Excel, Excel output
Meta dataOwner, team, stage (dev, test, production), commodity, product and location, used to find and filter compositions
Conversion defaultsThe worksheet's conversion settings, inherited by the columns
ScriptsScripts whose functions the expressions use. Composer lists your platform's build scripts for the worksheet type (category curve-build or timeseries-build, private and public), each with the functions it defines, and you can add any other script by id.
AutomationWhether it is built automatically when its inputs change, and what triggers it (see Builds, composed curves and automation)
BuildsHow many ondates it has been built for, the first and the latest, the composed curves or timeseries made from it, and Build for a range of ondates

The Range of a timeseries worksheet is relative to the ondate:

RangeDates
last(31)The 31 days up to the ondate
from(2026-01-01)From that date to the ondate
between(2026-01-01, 2026-06-30)Between two dates
within(...)Within a date or period
emptyThe 31 days up to the ondate

Compositions in Excel​

Every saved composition is a report, so it can be opened in the OpenDataDSL Excel Add-in alongside your other reports. Tick Hide in Excel under Properties, Report to leave it out of the Excel list.

In Excel, a composition is a table for the ondate you choose:

  • A heading row: Index, then the caption of each column.
  • A row for each tenor of a curve worksheet, or each date of a timeseries worksheet.
  • Only the columns with Excel ticked under Display. Untick it for working columns, such as the inputs of a spread, to keep just the results.
  • Numbers as plain values that Excel can calculate with, dates as yyyy-mm-dd (with the time when it is not midnight), and empty cells where a column has no value.

Excel reads the stored builds, so build the ondates you need first (see Builds, composed curves and automation). A composition that is built automatically is ready in Excel as soon as its inputs update.


Other actions​

From More in the toolbar:

Action
Ask Fusion AI to change itDescribe a change; Fusion shows it as a difference for you to apply (see Designing with Fusion AI)
Export CSVDownload the table
CloneSave a copy under a new name
Move to...Store it on another analytics area or record. Its builds, report dates and build automation move with it; links to the old id, composed curves made from it and compositions that link to it need updating
Save as templateMake a template from it in My templates
DeleteRemove it from the record it is stored on