A data loader is extract, transform and load in three steps, each done by a standard action, with a fourth that records the run.


The design and the deployed loader​

You build the loader in the Data Loaders screen. Its design, including the sample, is kept by the extension. Nothing runs until you deploy it, which saves:

WhatIdWhat it does
Workflowetl_<code>, e.g. etl_broker_gas_settlementsRuns the standard actions in four phases: EXTRACT, TRANSFORM, LOAD and RECORD. You can open it in the Workflow Manager.
ProcessETL_<CODE>, e.g. ETL_BROKER_GAS_SETTLEMENTSRuns the workflow with the loader's settings as its input, when you run it or on its schedule.
Run reportETL_<CODE>A report that each run adds itself to, one per day.
Custom actionetl_extract_<code>Only for a custom ODSL source: your code, as an action.

The process carries a copy of the loader's settings. When you change the loader, the screen shows it as changed until you deploy it again; runs use the deployed settings.

note

The workflow is made by the extension. If you change it in the Workflow Manager, deploying the loader again replaces it.


The workflow​

PhaseStepActionExits
EXTRACTextract_rowsetl_extract (or the custom action) reads the sourceok, failed
TRANSFORMmake_eventsetl_transform makes events with the mappingok, empty (no events), failed
LOADsave_eventsetl_load saves the events, 500 at a timeok, failed
RECORDrecord_run, record_empty, extract_failed, transform_failed, load_failedetl_report records the run and raises or closes the alertok

The workflow ends success after a run that loaded events or found nothing to load, and failed when a step failed.


What happens to each row​

  1. The row is read. Columns of JSON and XML records are paths, such as settle.price.
  2. The conditions are checked. A row that does not pass them all is left out (counted as left out, not a problem).
  3. Each field gets its value: from a column, a fixed value, a template or the run date. The value map is applied, empty values are recognised, and the value is converted to its data type.
  4. A row whose value cannot be converted, or whose required field is empty, is not loaded. It counts as a problem, and the first 20 problems are kept with the run, for example Row 7: settle is not a number (30,9x1).
  5. The event is made: event time (the run date when no column is mapped), start and end, the event type, the time zone, the event id and the _dsid.

Run results​

ResultWhat it means
successEvents were made and saved. Rows may have been left out or have had problems.
emptyThe source was read but no events were made: no rows, or every row left out.
failedThe source could not be read, every row had a problem, a row had a problem and the loader fails on problems, or the events could not be saved. The run report says in which step.